A pre-pull is when the drayage carrier pulls your container from the terminal before the last free day and holds it on its own yard until the warehouse can take it.
A pre-pull is a drayage move in two parts. The trucker pulls the container from the port before free time expires, parks it on a chassis in its own yard, then delivers it to the warehouse on a later day. It is the standard way to beat demurrage when the warehouse cannot receive the box before the last free day, or when the terminal appointment you got does not line up with the dock appointment you have.
The trade-off is that the chassis clock and the empty-return clock keep running while the box sits in the dray yard. A pre-pull buys you out of demurrage but can cost you chassis days and, if it drags, detention. It is a tool for a day or two, not a storage strategy.
Typical cost: a flat pre-pull fee per container plus a yard storage charge per day plus chassis rental per day. Together these are usually well under a single day of escalated demurrage, which is why the pre-pull exists.
Common mistakes: pre-pulling because the warehouse is too far to serve in one day, and paying for it on every container; forgetting the empty still has to go back inside the carrier's free days; and not telling the warehouse the box is sitting at the dray yard so a dock door can be opened sooner.
Pallet count, orders per month, channels, where the containers land. An executive comes back with a real quote — within 24 business hours.